Infrastructure that can't go offline.

A water utility doesn't get to pause. Every project we take on has to be planned around an unbreakable constraint: residents must keep receiving clean, pressurized water — every hour of every day — while we rebuild the system that delivers it.

A trusted partner to New England's water authorities.

Leed is a go-to contractor for the South Central Connecticut Regional Water Authority and for municipal water departments across the region. We've rehabilitated filtration trains, re-roofed finished-water reservoirs, replaced storage tanks, upgraded chemical feed systems, and rebuilt structural elements — frequently with the parallel process line kept in continuous service beside us.

That work demands a contractor who understands NSF-61 materials, EPA disposal standards, confined-space and dewatering protocols, and the regulatory expectations of public health agencies — and who can sequence it all without a single interruption to municipal supply.

Insulated, metal-jacketed water main hung beneath a bridge deck over a river, with crew working from the access walkway below
Wallingford Water Main Bridge Crossings
02 — Capabilities

Full-scope treatment work.

From the intake to the distribution main, Leed self-performs the disciplines that keep a treatment plant running and pushes the rest through a vetted bench of specialty subcontractors — all under a single accountable team.

Process & Filtration

Filter rehabilitation and dual-media replacement, underdrain rebuilds, automatic backwash systems, aeration and process pumping, and clearwell work — executed to EPA and NSF-61 standards with full media disposal documentation.

Storage & Containment

Finished-water storage tanks, geodesic aluminum domes, reservoir roof reconstruction, structural concrete repair, and secondary containment — built and renovated while parallel storage stays in service.

Chemical Feed & Mechanical

Chemical feed system upgrades, metering and dosing, valve and weir-gate replacement, fall-protection systems, and the process piping and controls that tie new equipment into legacy plants.

The two Lake Saltonstall finished-water tanks with aluminum geodesic dome roofs, autumn foliage behind
Lake Saltonstall Water Tank Renovations
03 — Method

Building around a live system.

The hardest part of water work is never the construction — it's keeping the water flowing while you do it. That's our specialty.

Zero interruption to municipal service.

On project after project we've isolated and dewatered one half of a treatment train, installed hydraulic separation curtains, and lowered heavy equipment dozens of feet below grade — all while the parallel basin kept supplying the community without a drop of lost service or a single boil-water notice.

We plan every shutdown, bypass, and tie-in during preconstruction, coordinate closely with plant operators, and sequence the work so the utility never has to choose between a needed repair and uninterrupted supply. When the project is done, the system is stronger — and residents never noticed a thing.

Crew on the Lake Watrous dam walkway as divers in an inflatable boat deploy the aerator floats
Lake Watrous Aerators Replacement
By the Numbers

Protecting the water hundreds of thousands of people drink.

7+ Trades Self-Performed In-House
2009 Building in Connecticut Since
DAS Prequalified · Water Treatment Plants
Our Work

Water treatment projects.

Partner With Leed

Planning a treatment, storage, or process upgrade?

Bring us in early. Our preconstruction team helps water authorities and municipalities phase complex upgrades around an uninterrupted supply — and prices the risk out before the first shutdown is ever scheduled.